apeks.tech

Free tool

RightShip inspection age trigger checker

RightShip is reducing the inspection age trigger for dry bulk and general cargo vessels from 14 years to 10.5 across four phases. Enter a delivery date to see when this vessel reaches each threshold and when each phase takes effect. The calculation runs in your browser — the date is never sent anywhere.

Use the date of delivery from the yard — the date RightShip counts vessel age from.

If you enter a rate, the result also shows the revenue at stake while the vessel sits outside charterers' vetting screens. Stays in your browser like everything else here.

Embed this tool on your site

Free to embed — classroom, company intranet or industry blog. The attribution link stays visible; that is the price of free.

<iframe src="https://apeks.tech/embed/rightship-age-trigger/" width="100%" height="560" style="border:1px solid #C3D6E4;border-radius:12px" title="RightShip inspection age trigger checker — apeks.tech" loading="lazy"></iframe>
<p style="font-size:13px">Tool by <a href="https://apeks.tech/tools/rightship-age-trigger/?utm_source=embed&utm_medium=backlink">apeks.tech</a></p>

The four phases

PhaseAge thresholdImplementation
113 years1 July – 1 October 2025
212 years1 April 2026
311 years1 July 2026
410.5 years20 January 2027

Scope: the age trigger applies to dry bulk and general cargo vessels. Vessel age is counted from the date of delivery.

On phase 4: RightShip updated the final step on 26 May 2026. Its owner, manager and charterer guidance now gives 10.5 years from 20 January 2027. Earlier RightShip publications gave 10 years from 1 January 2027; that figure no longer applies. A vessel without a valid RightShip inspection when it comes into scope has its Safety Score downgraded to 2 out of 5.

This is not a RightShip product and carries no RightShip endorsement. It is an arithmetic aid built on RightShip's published dates. The vetting decision, the Safety Score and the inspection validity rules are RightShip's alone. Once you know your dates, prepare the vessel itself with the RISQ inspection preparation checklist.

Questions

What is the RightShip inspection age trigger?

It is the vessel age at which RightShip expects a valid RightShip inspection to be in place. RightShip is reducing that age from 14 years to 10.5 across four phases, for dry bulk and general cargo vessels. A vessel that reaches the relevant age without a valid inspection — or, if it is already older, a vessel without one on the phase implementation date — has its Safety Score downgraded.

When does the 11-year trigger apply?

Phase 3, at 11 years, has an implementation date of 1 July 2026. Phase 2, at 12 years, applied from 1 April 2026, and phase 1, at 13 years, ran from 1 July to 1 October 2025.

When does the final phase apply?

Phase 4, at 10.5 years, applies from 20 January 2027. RightShip updated this final step on 26 May 2026; earlier RightShip publications had given 10 years from 1 January 2027, and that figure no longer applies.

Does this checker send my vessel data anywhere?

No. The calculation runs entirely in your browser. The delivery date you enter is never transmitted, logged or stored.

Apeks Brief

Free

Decision intelligence for the people who run ships: what changed, who is affected, what to do.

  • One email a week — the default; you can change it anytime.
  • The week's notable developments: a headline and one line on what changed.
  • Turkish or English. Unsubscribe in one click; your address is never shared.
From the latest issue 24 October 2026
  • European Parliament Backs Delay to Methane Obligations on Energy Imports
  • RightShip Rev 4.0: general cargo added, 'unknown' ship records on the platform rated Unacceptable
  • EU ETS for ships of 400 to 5,000 GT: what the Commission proposed, which ships, which dates
Read the full issue →

Free, with no paid tier. We send a confirmation link first — nothing arrives until you confirm.