apeks.tech

Inspection Intelligence

What inspectors are finding, and what a good answer looks like

Vetting and inspection regimes decide which ships trade and on what terms. We track the recurring findings and focus areas that matter to owners and technical managers — SIRE 2.0, RightShip, Port State Control, CDI — with the same discipline we apply everywhere: every pattern is drawn from public sources and cited, aggregated at fleet level with no vessel named, and written by people who have stood in the engine room during the inspection.

Inspection regimes

Free report

SIRE 2.0 Observation Response Pack

The response template — root cause, corrective and preventive action, objective evidence — with four worked engine-room examples and what an inspector asks to see.

Get the pack →

Free tool

RightShip age trigger checker

Enter a delivery date and see when each phase of the revised inspection age trigger catches the vessel. Runs in your browser — the date is never sent anywhere.

Check your dates →

Free tool

RightShip readiness check

Where does the vessel actually stand today — condition, records, crew familiarity? Work through it before the inspection window opens, then sequence the fixes with the 90-day preparation plan. Both run in your browser.

Check readiness →

Free tool

PSC deficiency checklist generator

Pick a ship type and get a Port State Control preparation checklist organised by the official Paris MoU deficiency-code categories. Runs in your browser. See all tools →

Build a checklist →

Latest inspection coverage

See all analysis →

Inspection regime dates

  1. 2 Sep 2024

    SIRE 2.0 goes live

    OCIMF’s digitalised, risk-based tanker inspection regime replaces the legacy SIRE programme.

  2. 1 Apr 2026

    RightShip age trigger steps to 12 years

    Phase 2 of the revised trigger. A vessel without a valid RightShip inspection at the relevant age has its Safety Score downgraded.

  3. 1 Jul 2026

    RightShip age trigger steps to 11 years

    Phase 3. The threshold is being reduced from 14 years to 10.5 across four phases — this is the third.

  4. 20 Jan 2027

    RightShip age trigger steps to 10.5 years

    Phase 4, the final step, for dry bulk and general cargo vessels. RightShip updated this phase on 26 May 2026; the earlier 10-year, 1 January 2027 figure no longer applies.

Sources: OCIMF — SIRE programme; RightShip — revised timeline press release and what it means for owners, managers and charterers. The final phase follows RightShip’s 26 May 2026 update, as given in its owners, managers and charterers guidance: 10.5 years from 20 January 2027. Earlier RightShip publications giving 10 years from 1 January 2027 are superseded. Dates as announced by the scheme owners — check the source before planning against them.

Apeks Brief

Free

Decision intelligence for the people who run ships: what changed, who is affected, what to do.

  • One email a week — the default; you can change it anytime.
  • The week's notable developments: a headline and one line on what changed.
  • Turkish or English. Unsubscribe in one click; your address is never shared.
From the latest issue 24 October 2026
  • European Parliament Backs Delay to Methane Obligations on Energy Imports
  • RightShip Rev 4.0: general cargo added, 'unknown' ship records on the platform rated Unacceptable
  • EU ETS for ships of 400 to 5,000 GT: what the Commission proposed, which ships, which dates
Read the full issue →

Free, with no paid tier. We send a confirmation link first — nothing arrives until you confirm.